Plan of Procedures

Plan of Procedures


  1. Research parts, materials, and supplies
  2. Inquire about those items
  3. Order items from desired companies
  4. Make sure all parts were delivered
  5. Make adjustments to parts (cut down to size)
  1. Proceed with building individual parts of the project
  2. Test hull by placing it in water

  1. Make adjustments if needed
  2. Commence final testing
  3. Prepare for challenge at the Neptune Aquatic
  4. Arrive at testing facility (Neptune pool)
  5. Make sure joints are completely sealed and connected to each other
  6. Make sure that appendages are securely connected to main body of the ROV
  7. Make sure that there are no loose pieces or parts before placing in the water
  8. Redo the buoyancy calculations to check if buoyancy of the system is correct
  9. Place the ROV into the water
  10. See how the ROV sits in the water (too buoyant, not buoyant enough, neutral)