Tuesday, January 20, 2015

Supply List, Material List, and Part List


Supply List:
  • PVC glue
  • Drill
  • Saw
  • Clamps
  • Hose Clamps

Material List:
  • PVC piping  (1 inch) 
  • PVC glue
  • PVC 3-way elbow (1 inch)
  • PVC  t-shaped connector (1 inch)
  • PVC 4-way tee (1 inch)
  • PVC 4-way cross (1 inch)

Parts List:
  • 2213N 800Kv Brushless Motor
  • 65 mm Propeller
Tool List:
  • Circular Saw
  • PVC cutter







Plan of Procedures

Plan of Procedures


  1. Research parts, materials, and supplies
  2. Inquire about those items
  3. Order items from desired companies
  4. Make sure all parts were delivered
  5. Make adjustments to parts (cut down to size)
  1. Proceed with building individual parts of the project
  2. Test hull by placing it in water

  1. Make adjustments if needed
  2. Commence final testing
  3. Prepare for challenge at the Neptune Aquatic
  4. Arrive at testing facility (Neptune pool)
  5. Make sure joints are completely sealed and connected to each other
  6. Make sure that appendages are securely connected to main body of the ROV
  7. Make sure that there are no loose pieces or parts before placing in the water
  8. Redo the buoyancy calculations to check if buoyancy of the system is correct
  9. Place the ROV into the water
  10. See how the ROV sits in the water (too buoyant, not buoyant enough, neutral)