Preliminary ROV Testing Procedures


Testing Procedures
  1. Meet With Team and Mrs. Green to discuss project
  2. Design problem situation and finalize it
  3. Start to design individual parts of project
  4. Finish designs and convene with team
  5. Finalize drawings and designs
  6. Research parts, materials, and supplies
  7. Inquire about those items
  8. Order items from desired companies
  9. Make sure all parts were delivered
  10. Proceed with building individual parts of the project
  11. Test hull by placing it in water
  12. Make adjustments if needed
  13. Commence final testing
  14. Prepare for challenge at the Neptune Aquatic
  15. Arrive at testing facility (Neptune pool)
  16. Make sure joints are completely sealed and connected to each other
  17. Make sure that appendages are securely connected to main body of the ROV
  18. Make sure that there are no loose pieces or parts before placing in the water
  19. Redo the buoyancy calculations to check if buoyancy of the system is correct
  20. Place the ROV into the water
  21. See how the ROV sits in the water (too buoyant, not buoyant enough, neutral)